Orthophoto and Digital Elevation Model Production of the AWASH-EFESON-SRINKA Railway Project, which consists of 400 km long and 12 km wide in Ethiopia, has been completed.
Orthophoto and Digital Elevation Model Production of the AWASH-EFESON-SRINKA Railway Project, which consists of 400 km long and 12 km wide in Ethiopia, has been completed.